Solar farms in Yorkshire and the Humber
Every solar farm in the UK government's register of power stations, with its capacity, operator and location. Each site page merges the government's operating record with its planning history where the two match.
Matching sites14
Capacity70 MW
England562
Wales75
Planning, consented, under-construction and stopped projects open in the project pipeline.

Largest matching sites by capacity
Capacity by nation click to filter
Map: solar farms in Yorkshire and the Humber
14 sites mapped
Solar farms Circle size shows capacity. The filters below narrow the map and the list together.
| Site | Capacity | Stage |
|---|---|---|
| Ottringham | 6.07 MW | |
| Ash Row Farm | 5 MW | |
| Bransholme Solar | 5 MW | |
| Carlam Hill Education | 5 MW | |
| Cold Harbour | 5 MW | |
| Mill Hill Farm | 5 MW | |
| Peter Hill | 5 MW | |
| Pollington Airfield | 5 MW | |
| Sandhutton | 5 MW | |
| East Appleton | 4.98 MW | |
| Stripe | 4.98 MW | |
| Askern | 4.97 MW | |
| Ainderby | 4.96 MW | |
| Primrose Hill | 4.35 MW |
Page 1 of 1 Β· 14 sites
Largest operators
More on uk solar farms
This list covers sites in operation. Proposals, consented schemes and sites under construction are in the project pipeline. For how the technology works, see the guide.
Source: Department for Energy Security and Net Zero, Digest of UK Energy Statistics (DUKES) table 5.11, and the Renewable Energy Planning Database. Capacities are installed capacity, not live output.