Octopus Investments: solar farms in East of England
Every solar farm in the UK government's register of power stations, with its capacity, operator and location. Each site page merges the government's operating record with its planning history where the two match.
Planning, consented, under-construction and stopped projects open in the project pipeline.

Largest matching sites by capacity
Capacity by nation click to filter
Map: octopus Investments: solar farms in East of England
25 sites mappedOperator: Octopus Investments Β· remove
| Site | Capacity | Stage |
|---|---|---|
| Breach Solar | 67.4 MW | |
| Melbourn Muncey Farm | 30.9 MW | |
| Waterloo Farm 1 and 2 | 28.7 MW | |
| Abbots Ripton | 24.7 MW | |
| Willburton 2 (Mingay Farm) | 19.3 MW | |
| Melbourn Black Peak | 19 MW | |
| Chediston Hall | 12.4 MW | |
| Chisbon | 12.3 MW | |
| Stratton Hall | 11.8 MW | |
| Burntstalk Farm | 11.5 MW | |
| Wiggin Hill | 11.4 MW | |
| The Hydes | 10.7 MW | |
| Lexham | 7.92 MW | |
| Avenue Farm | 7.65 MW | |
| Chittering 2 | 6.3 MW | |
| Reaches Farm | 6.24 MW | |
| Meadow Farm | 6.11 MW | |
| Drapers Farm | 6 MW | |
| Birch Estate | 5 MW | |
| Tooley Farm | 5 MW | |
| Turves | 5 MW | |
| Brickkiln Lane | 4.99 MW | |
| Cressing | 4.99 MW | |
| Barn Farm | 4.69 MW | |
| Ryston Farm | 4.62 MW |
More on uk solar farms
This list covers sites in operation. Proposals, consented schemes and sites under construction are in the project pipeline. For how the technology works, see the guide.
Source: Department for Energy Security and Net Zero, Digest of UK Energy Statistics (DUKES) table 5.11, and the Renewable Energy Planning Database. Capacities are installed capacity, not live output.