SOLAR Β· OPERATIONAL

Ryston Farm

Ryston Farm is a 4.62 MW solar farm in East of England, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningMay 2013 (completed)
  2. ConsentedAug 2013 (completed)
  3. ConstructionAug 2014 (completed)
  4. OperatingMay 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.62 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE38 0AA
Coordinates
52.5918, 0.3854

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Ryston Farm compares

485th of 662largest solar farms in the UK register
71st of 76in East of England
0.08%of listed UK solar farms capacity
β‰ˆ 4.0 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.62 MW station would generate roughly 4.0 GWh of electricity in a year, similar to the annual use of about 1,500 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Ryston Estate Solar Park
Developer / operator
Lightsource Renewable Energy
Planning authority
King's Lynn and West Norfolk
Planning reference
13/00692/FM
Application submitted
14 May 2013
Permission granted
13 August 2013
Construction started
6 August 2014
Began operating
7 May 2015
Capacity in planning record
4.8 MW
Address
Land Adjacent A10, Ryston, Norfolk, Norfolk, PE38 0AE
REPD reference
1672

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026