Burntstalk Farm
Burntstalk Farm is a 11.5 MW solar farm in East of England, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East of England
- England
Key facts
- Installed capacity
- 11.5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PE32 1JA
- Coordinates
- 52.6732, 0.6271
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Burntstalk Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 11.5 MW station would generate roughly 10 GWh of electricity in a year, similar to the annual use of about 3,740 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East of England All run by Octopus InvestmentsNearby generating sites
- Swaffham II Β· 1.8 MW onshore wind farm5.0 km
- Pickenham Β· 4 MW onshore wind farm8.9 km
- Lexham Β· 7.92 MW solar farm12.8 km
- Reaches Farm Β· 6.24 MW solar farm13.4 km
- QEH Β· 0.81 MW onshore wind farm15.3 km
- Meadow Farm Β· 6.11 MW solar farm15.5 km
- Kings Lynn Β· 395 MW CCGT gas power station17.4 km
- Ryston Farm Β· 4.62 MW solar farm18.7 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Burntstalk Solar Park
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- Breckland
- Planning reference
- 3PL/2012/1036/F
- Application submitted
- 8 October 2012
- Permission granted
- 21 December 2012
- Began operating
- 30 March 2013
- Capacity in planning record
- 11.5 MW
- Address
- Low Road, Narford, Kings Lynn, Norfolk, Norfolk
- REPD reference
- 1713
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.