πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Wiggin Hill

Wiggin Hill is a 11.4 MW solar farm in East of England, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningNov 2012 (completed)
  2. ConsentedFeb 2013 (completed)
  3. ConstructionNov 2014 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
11.4 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE27 3LL
Coordinates
52.3455, -0.0865

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wiggin Hill compares

122nd of 662largest solar farms in the UK register
27th of 76in East of England
0.20%of listed UK solar farms capacity
β‰ˆ 10 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 11.4 MW station would generate roughly 10 GWh of electricity in a year, similar to the annual use of about 3,710 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Wiggin Hill Solar Farm - Phase 1
Developer / operator
Lightsource Renewable Energy
Planning authority
Huntingdonshire
Planning reference
1201911FUL
Application submitted
20 November 2012
Permission granted
19 February 2013
Construction started
14 November 2014
Began operating
14 March 2015
Capacity in planning record
6.8 MW
Address
Land North Of Wiggin Hill Old Ramsey Road St Ives, Cambridgeshire, PE27 3L
REPD reference
1865

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.