Bury Green
Bury Green is a 4.97 MW solar farm in East of England, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East of England
- England
Key facts
- Installed capacity
- 4.97 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PE26 2RY
- Coordinates
- 52.4530, -0.1546
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Bury Green compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.97 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,610 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East of England All run by Greencoat CapitalNearby generating sites
- RamseySolar Β· 4.97 MW solar farm2.5 km
- Ramsey 2 Wind Farm Β· 8 MW onshore wind farm2.5 km
- Ramsey Β· 1.8 MW onshore wind farm3.3 km
- Huntingdon Β· 10.2 MW solar farm6.7 km
- Glassmoor II Β· 12.3 MW onshore wind farm7.9 km
- Abbots Ripton Β· 24.7 MW solar farm8.8 km
- Whittlesey Β· 1.8 MW onshore wind farm11.7 km
- Turves Β· 5 MW solar farm12.2 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Bury Green Farm Solar
- Developer / operator
- Bury Green Farm Solar (Caledon Partners)
- Planning authority
- Huntingdonshire
- Planning reference
- 15/00790/FUL
- Application submitted
- 18 May 2015
- Permission granted
- 25 September 2015
- Construction started
- 18 January 2016
- Began operating
- 15 March 2016
- Capacity in planning record
- 5 MW
- Address
- New Fen Road Lane, Ramsey, Cambridgeshire
- REPD reference
- 6180
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.