πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Cotton Farm

Cotton Farm is a 16.4 MW onshore wind farm in East of England, England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East of England
  • England
Project stageOperating
  1. PlanningAug 2008 (completed)
  2. ConsentedDec 2010 (completed)
  3. ConstructionMay 2012 (completed)
  4. OperatingMar 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
16.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Greencoat Capital
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
52.2615, -0.1952

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Cotton Farm compares

251st of 488largest wind farms in the UK register
21st of 48in East of England
0.06%of listed UK wind farms capacity
β‰ˆ 37 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 16.4 MW station would generate roughly 37 GWh of electricity in a year, similar to the annual use of about 13,830 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Greencoat UK Wind
Planning authority
Huntingdonshire
Planning reference
0802296FUL
Application submitted
4 August 2008
Permission granted
14 December 2010
Construction started
1 May 2012
Began operating
31 March 2013
Capacity in planning record
20 MW
Address
Land between Graveley, Offord Darcy and Great Paxton, Cambridgeshire
REPD reference
3971

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.