Woolley Hill (GB)
Woolley Hill (GB) is a 10 MW onshore wind farm in East of England, England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- East of England
- England
Key facts
- Installed capacity
- 10 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RES Group
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PE28 0UA
- Coordinates
- 52.3398, -0.3080
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Woolley Hill (GB) compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,440 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in East of England All run by RES GroupNearby generating sites
- Red Tile Β· 24 MW onshore wind farm8.6 km
- Abbots Ripton Β· 24.7 MW solar farm8.6 km
- Huntingdon Β· 10.2 MW solar farm10.1 km
- Cotton Farm Β· 16.4 MW onshore wind farm11.6 km
- Wiggin Hill Β· 11.4 MW solar farm15.1 km
- Caldecote Β· 4.98 MW solar farm15.9 km
- Little Barford GT Β· 17 MW oil-fired power station16.2 km
- Little Barford Β· 735 MW CCGT gas power station16.2 km
Also operated by RES Group
RES Group operates 98 sites in the register. Largest first:
- Beinneun Wind Farm Β· onshore wind farm109 MW
- Cumberhead Wind Farm Β· onshore wind farm50 MW
- Hill of Towie Wind Farm (GB) Β· onshore wind farm48.3 MW
- Crossdykes Wind Farm Β· onshore wind farm48 MW
- Blary Hill Β· onshore wind farm35 MW
- Tormywheel Β· onshore wind farm30.8 MW
- Garreg Llwyd (GB) Β· onshore wind farm30.4 MW
- Solwaybank Β· onshore wind farm30.4 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Woolley Hill Wind Farm
- Developer / operator
- Aviva
- Planning authority
- Huntingdonshire
- Planning reference
- 1001741FUL
- Application submitted
- 11 November 2010
- Permission granted
- 23 March 2012
- Construction started
- 17 March 2014
- Began operating
- 30 April 2014
- Capacity in planning record
- 10 MW
- Address
- North of the A14, between the villages of Ellington & Woolley, Cambridgeshire
- REPD reference
- 4175
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.