Project stageOperating
  1. PlanningNov 2010 (completed)
  2. ConsentedMar 2012 (completed)
  3. ConstructionMar 2014 (completed)
  4. OperatingApr 2014 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
10 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE28 0UA
Coordinates
52.3398, -0.3080

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Woolley Hill (GB) compares

326th of 488largest wind farms in the UK register
29th of 48in East of England
0.03%of listed UK wind farms capacity
β‰ˆ 23 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,440 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Woolley Hill Wind Farm
Developer / operator
Aviva
Planning authority
Huntingdonshire
Planning reference
1001741FUL
Application submitted
11 November 2010
Permission granted
23 March 2012
Construction started
17 March 2014
Began operating
30 April 2014
Capacity in planning record
10 MW
Address
North of the A14, between the villages of Ellington & Woolley, Cambridgeshire
REPD reference
4175

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.