Melbourn Black Peak
Melbourn Black Peak is a 19 MW solar farm in East of England, England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East of England
- England
Key facts
- Installed capacity
- 19 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SG8 7ND
- Coordinates
- 52.0782, 0.0489
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Melbourn Black Peak compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 19 MW station would generate roughly 17 GWh of electricity in a year, similar to the annual use of about 6,150 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East of England All run by Octopus InvestmentsNearby generating sites
- Melbourn Muncey Farm Β· 30.9 MW solar farm3.0 km
- Bury Lane Β· 22.2 MW solar farm3.1 km
- Royston Β· 4.96 MW solar farm5.1 km
- Royston CIC Β· 4.9 MW solar farm5.1 km
- Vine Farm Β· 45.9 MW solar farm8.9 km
- Skylark Β· 4.94 MW solar farm16.0 km
- Biggleswade Β· 20 MW onshore wind farm19.2 km
- Caldecote Β· 4.98 MW solar farm22.8 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Black Peak Farm
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- South Cambridgeshire
- Planning reference
- S/1902/14/FL
- Application submitted
- 7 August 2014
- Permission granted
- 15 December 2014
- Construction started
- 30 December 2014
- Began operating
- 25 March 2015
- Capacity in planning record
- 31.8 MW
- Address
- Black Peak Farm, Fowlmere Road, Melbourn, Royston, Hertfordshire, Cambridgeshire, SG8 7PJ
- REPD reference
- 2219
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.