Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue on the National Grid (England & Wales) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| New Marton Solar Farm - PVDP Solar + storage · SolarFour Ltd |
780 MW | Scoping |
| Didcot BESS 1 Battery storage · Downing Renewable Developments LLP |
750 MW | Scoping |
| East Pit Solar + storage · Cs UK Holdings III Limited |
750 MW | Scoping |
| FCC Thurcroft BESS Battery storage · Downing Renewable Developments LLP |
750 MW | Scoping |
| Meridian Solar Farm Solar + storage · Meridian Solar Farm Limited |
750 MW | Scoping |
| Old Flatts Farm Solar + storage · Net Zero One Ltd |
750 MW | Scoping |
| Thurrock Power Station Battery storage · Thurrock Flexible Generation Limited |
750 MW | |
| Mares Interconnector · Maresconnect Limited |
750 MW | Awaiting Consents |
| Little Barford Battery storage · RWE Generation UK Plc |
740 MW | |
| One Earth Solar Farm Solar + storage · One Earth Solar Farm Limited |
740 MW | Awaiting Consents |
| J212 High Grove Solar Solar + storage · RWE Renewables UK Solar and Storage Limited |
720 MW | Awaiting Consents |
| Scira-Dudgeon Extension Offshore wind · Sheringham Shoal And Dudgeon Extensions Projco Limited |
719 MW | Scoping |
| Rye House Gas · VPI Power Limited |
715 MW | |
| Welbeck-Newark Solar Farm - PVDP Solar + storage · SolarTen Ltd |
710 MW | Scoping |
| Bolney Farm 2 Solar + storage · Dragon Green 7 Renewables Ltd |
700 MW | Scoping |
| Bramley Farm 2 Solar + storage · Bramley 7 Renewables Ltd |
700 MW | Scoping |
| Cowley Farm 2 Solar + storage · Cowley 7 Renewables Ltd |
700 MW | Scoping |
| Didcot Farm 2 Solar + storage · Appleford 7 Renewables Limited |
700 MW | Scoping |
| Enderby Farm 2 Solar + storage · 548 UK Investment Holdings Limited |
700 MW | Scoping |
| ER TWD Energy Wind + storage · Er Project Development Co Limited |
700 MW | Scoping |
| Fleet Farm 2 Solar + storage · Basingstoke East 7 Renewables Ltd |
700 MW | Scoping |
| Grantham Generation Solar + storage · Aukera Energy Limited |
700 MW | Scoping |
| Great Oak Solar Solar + storage · RWE Renewables UK Solar and Storage Limited |
700 MW | Scoping |
| Market Harborough Solar + storage · Connectid 1 Limited |
700 MW | Awaiting Consents |
| Pelham Farm 2 Solar + storage · 548 UK Investment Holdings Limited |
700 MW | Scoping |
| Rat Hall Mod App Solar + storage · Kingsway Solar Farm Limited |
700 MW | Scoping |
| Sundon Farm 2 Solar + storage · 548 UK Investment Holdings Limited |
700 MW | Scoping |
| Walham 700MW BESS Battery storage · GPC 1154 Ltd |
700 MW | Scoping |
| Waltham Cross Farm 2 Solar + storage · Waltham Cross 7 Renewables Limited |
700 MW | Scoping |
| Wilton CCGT Project 2 Gas · Sembcorp Utilities (UK) Limited |
700 MW | Consents Approved |
| Wymondley GEC (Ethos Green) Solar + storage · Wymondley Green Energy Centre Ltd |
700 MW | Awaiting Consents |
| Kulizumboo Interconnector Interconnector · Kulizumboo Limited |
700 MW | Scoping |
| Carrington Battery storage · Carrington Storage Limited |
680 MW | Consents Approved |
| East Anglia One Offshore wind · East Anglia One Limited |
680 MW | |
| Exeter BESS Battery storage · Exeter Storage Limited |
680 MW | Scoping |
| Bramford GEC (Ethos Green) Solar + storage · Bramford Green Energy Centre Ltd |
650 MW | Awaiting Consents |
| East Claydon Greener Grid Park Battery storage · East Claydon Energy Limited |
650 MW | Scoping |
| PVDP Scarning Solar + storage · SolarFour Ltd |
650 MW | Scoping |
| Killingholme Gas · Uniper UK Limited |
619 MW | |
| PVDP Woodbridge Solar + storage · SolarSeven Ltd |
610 MW | Scoping |
| Ardleigh Solar & BESS Solar + storage · Nembus BESS Limited |
600 MW | Scoping |
| Bicker Fenn Energy Park Solar + storage · Beacon Fen Energy Park Limited |
600 MW | Scoping |
| Braybrooke Battery storage · Sse De Solar Holdco Limited |
600 MW | Scoping |
| Brinsworth Battery storage · Sse Renewables Solar & Battery Holdings Limited |
600 MW | Scoping |
| Chapel Rush Solar Solar + storage · RWE Renewables UK Solar and Storage Limited |
600 MW | Scoping |
| Chesterfield Solar + storage · Sse Renewables Solar & Battery Holdings Limited |
600 MW | Scoping |
| Cottam Solar PV + BESS Solar + storage · Cottam Solar Project Limited |
600 MW | Consents Approved |
| Cottered Solar + storage · Littleton Pastures Solar Limited |
600 MW | Scoping |
| Crathorne Estate BESS and Solar Farm Solar + storage · Exagen Development Limited |
600 MW | Scoping |
| Daines BESS Battery storage · Sse Daines BESS Limited |
600 MW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.