Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · NGETBramley Farm 2
Bramley Farm 2 is a 700 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Basingstoke East 400kV Substation, with capacity due from May 2038. The connection agreement is held by Bramley 7 Renewables Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom May 2038 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002735
- Customer
- Bramley 7 Renewables Ltd
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 700 MW
- Change in this agreement
- +700 MW
- Capacity effective from
- 30 May 2038
- Connection site
- Basingstoke East 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Other projects at Basingstoke East 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem