Waltham Cross Farm 2

Waltham Cross Farm 2 is a 700 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at London North East Connection Node A 400kV, with capacity due from April 2033. The connection agreement is held by Waltham Cross 7 Renewables Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002748
Customer
Waltham Cross 7 Renewables Limited
Technology
Demand, Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
700 MW
Change in this agreement
+700 MW
Capacity effective from
4 April 2033
Connection site
London North East Connection Node A 400kV
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near London North East Connection Node A · Grid map

Other projects at London North East Connection Node A 400kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem