Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Bolney Farm 2

Bolney Farm 2 is a 700 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at DRAGON GREEN 400kV SUBSTATION, with capacity due from November 2037. The connection agreement is held by Dragon Green 7 Renewables Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002733
Customer
Dragon Green 7 Renewables Ltd
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
700 MW
Change in this agreement
+700 MW
Capacity effective from
30 November 2037
Connection site
DRAGON GREEN 400kV SUBSTATION
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near DRAGON GREEN · Grid map

Other projects at DRAGON GREEN 400kV SUBSTATION

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem