NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown968461.1 GW in total
In planning968scoping or awaiting consent
Consented or building149closest to connecting
Built212connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

968 projects · page 4 of 20
ProjectCapacityStageConnection siteFrom
SPR CS1
Offshore wind · Scottish Power Renewables (UK) Limited
1.0 GWScoping Spr Cs1 275/66Kv Offshore Substation
National Grid (England & Wales)
Oct 2037
Stoke Bardolph
Solar + storage · Stoke Bardolph 10 Renewables Limited
1.0 GWScoping Trent Valley South Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2034
West Haddon
Solar · West Haddon 10 Renewables Limited
1.0 GWScoping Derbyshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
West Weybridge
Solar + storage · West Weybridge 10 Renewables Limited
1.0 GWScoping London North West Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2038
Wymondley Farm
Solar + storage · Wymondley 10 Renewables Ltd
1.0 GWScoping West Anglia Connection Node B 400Kv Substation
National Grid (England & Wales)
Oct 2032
Wymondley High Impact Green Energy Hub (HIGEH) 1
Solar + storage · Telis Energy UK Limited
1.0 GWScoping Wymondley 400kV Substation
National Grid (England & Wales)
Oct 2033
The Superconnection
Interconnector · Asc Energy plc
1.0 GWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2032
Bradford Solar Farm
Solar · SolarFour Ltd
960 MWScoping Staffordshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Scira-Dudgeon Extension
Offshore wind · Sheringham Shoal And Dudgeon Extensions Projco Limited
950 MWScoping Norwich Main 400kV Substation
National Grid (England & Wales)
Oct 2031
Norwich Main BESS
Solar + storage · Tasway Energy Park Limited
950 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Trawsfynydd B Cwmni Egino
Nuclear · Cwmni Egino
940 MWScoping Trawsfynydd 275kV Substation
National Grid (England & Wales)
Nov 2037
Lacey's Farm BESS
Battery storage · Bluestone Energy Ltd
924 MWScoping South Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2033
Protos Power Station
Gas · Keadby Generation Limited
910 MWScoping Merseyside Connection Node A 400Kv Substation
National Grid (England & Wales)
Nov 2037
Stallingborough Carbon Capture Ccgt
Gas · RWE Generation UK Plc
906 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
May 2035
Elmya Gissing BESS & PV
Solar + storage · Rpc Elmya Carnation Gissing Limited
900 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Keadby North Power Station
Gas · Keadby Generation Limited
892 MWAwaiting Consents Keadby 400kV Substation
National Grid (England & Wales)
Oct 2031
East Anglia One North
Offshore wind · East Anglia One North Limited
880 MWAwaiting Consents Friston 400kV Substation
National Grid (England & Wales)
Oct 2034
East Anglia Two
Offshore wind · East Anglia Two Limited
880 MWAwaiting Consents EA2A and EA2B 275/66kV Offshore Platform
National Grid (England & Wales)
Dec 2030
East Anglia One North
Offshore wind · East Anglia One North Limited
860 MWAwaiting Consents Friston 400kV Substation
National Grid (England & Wales)
Oct 2029
East Anglia Two
Offshore wind · East Anglia Two Limited
860 MWAwaiting Consents EA2A and EA2B 275/66kV Offshore Platform
National Grid (England & Wales)
Mar 2028
Norfolk001
Solar + storage · Epl Newco1 Limited
860 MWScoping Walpole 400kV Substation
National Grid (England & Wales)
Nov 2031
Bradenham - Thetford (Necton) GEC (Ethos Green)
Solar + storage · Necton Green Energy Centre Ltd
850 MWScoping Necton 400kV Substation
National Grid (England & Wales)
Oct 2033
Buntington GEC
Solar + storage · Buntington Green Energy Centre Ltd
850 MWAwaiting Consents Cottered 400kV Substation
National Grid (England & Wales)
Jul 2032
Elmya Kilworth BESS & PV
Solar + storage · Rpc Elmya Carnation Kilworth Limited
850 MWScoping Derbyshire Connection Node H 400kV Substation
National Grid (England & Wales)
Oct 2037
Elmya Ryston BESS & PV
Solar + storage · Elmya Energy UK 13 Limited
850 MWScoping North Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Hockliffe GEC (Ethos Green)
Solar + storage · Hockliffe Green Energy Centre Ltd
850 MWScoping Dunstable 400kV Substation
National Grid (England & Wales)
Oct 2032
Botley West - Cote Solar Power Station
Solar · Solarfive Ltd
840 MWAwaiting Consents Farmoor 400kV Substation
National Grid (England & Wales)
Oct 2031
Woburn Solar Farm
Solar · SolarThree Ltd
840 MWScoping Dunstable 400kV Substation
National Grid (England & Wales)
Oct 2031
Grantham Solar Farm - RSL
Solar + storage · South Grantham Energy Centre Limited
810 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Botley GEC (Ethos Green)
Solar + storage · Botley Green Energy Centre Ltd
800 MWAwaiting Consents Botley 400kV Substation
National Grid (England & Wales)
Oct 2033
Cliff Hill Energy Farm
Solar + storage · Renewable Energy Systems Limited
800 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
Oct 2034
East Lincolnshire Solar
Solar + storage · Statkraft UK Ltd
800 MWScoping Lincolnshire Coastal Node B 400kV Substation
National Grid (England & Wales)
May 2035
Elmya Foxdale BESS
Battery storage · Rpc Elmya Carnation Foxdale Limited
800 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Hill Street Solar PV/BESS Station
Solar + storage · Hill Street Shelfco 1 Limited
800 MWScoping Staffordshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Melksham BESS & PV
Solar + storage · Elements Green Limited
800 MWScoping Melksham 400kV Substation
National Grid (England & Wales)
Oct 2037
Monk Fryston Energy Park
Solar + storage · Elements Green Development Ltd
800 MWScoping Monk Fryston 400kV Substation
National Grid (England & Wales)
Oct 2035
NatPower Hartlepool Green Energy Park
Battery storage · Np Spv 34 Limited
800 MWScoping Wearside Connection Node A 275kV Substation
National Grid (England & Wales)
Oct 2035
Scarning
Solar + storage · Connectid 3 Limited
800 MWAwaiting Consents North Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Springwell
Solar + storage · Springwell Energyfarm Limited
800 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
Oct 2030
Stockhills Farm
Solar + storage · Bsr Applications Limited
800 MWScoping Severn Connection Node A 400kv Substation
National Grid (England & Wales)
Oct 2037
Sweet Briar Energy Park
Solar + storage · Sweet Briar 2 Energy Park Limited
800 MWScoping South Humber Connection Node A
National Grid (England & Wales)
Oct 2035
Tween Bridge Solar Park
Solar + storage · RWE Renewables UK Solar and Storage Limited
800 MWScoping Trent Valley North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
New Marton Solar Farm - PVDP
Solar + storage · SolarFour Ltd
780 MWScoping Cheshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Didcot BESS 1
Battery storage · Downing Renewable Developments LLP
750 MWScoping Chiltern Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
East Pit
Solar + storage · Cs UK Holdings III Limited
750 MWScoping Rhigos 400kV Substation
National Grid (England & Wales)
Oct 2037
FCC Thurcroft BESS
Battery storage · Downing Renewable Developments LLP
750 MWScoping Leeds North Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Meridian Solar Farm
Solar + storage · Meridian Solar Farm Limited
750 MWScoping Weston Marsh 400kV Substation
National Grid (England & Wales)
Jun 2033
Old Flatts Farm
Solar + storage · Net Zero One Ltd
750 MWScoping Brinsworth 400kV Substation
National Grid (England & Wales)
Oct 2029
Mares
Interconnector · Maresconnect Limited
750 MWAwaiting Consents Bodelwyddan 400kV Substation
National Grid (England & Wales)
Jun 2030
One Earth Solar Farm
Solar + storage · One Earth Solar Farm Limited
740 MWAwaiting Consents High Marnham 400kV Substation
National Grid (England & Wales)
Oct 2029
Page 4 of 20

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.