🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Offshore wind

OFFSHORE WIND · NGET

East Anglia Two

East Anglia Two is a 880 MW offshore wind project in planning, connecting to the National Grid (England & Wales) network at EA2A and EA2B 275/66kV Offshore Platform, with capacity due from December 2030. The connection agreement is held by East Anglia Two Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Dec 2030 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-000134-2
Customer
East Anglia Two Limited
Technology
Wind Offshore
Total capacity
880 MW
Change in this agreement
+20 MW
Capacity effective from
31 December 2030
Connection site
EA2A and EA2B 275/66kV Offshore Platform
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents

Connection site

The connection site could not be placed on the map.

Projects connecting near EA · Grid map

Other projects at EA2A and EA2B 275/66kV Offshore Platform

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem