Grid infrastructure › Connection queue › Offshore wind
OFFSHORE WIND · NGETEast Anglia One North
East Anglia One North is a 860 MW offshore wind project in planning, connecting to the National Grid (England & Wales) network at Friston 400kV Substation, with capacity due from October 2029. The connection agreement is held by East Anglia One North Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-000269-1
- Customer
- East Anglia One North Limited
- Technology
- Wind Offshore
- Total capacity
- 860 MW
- Change in this agreement
- +860 MW
- Capacity effective from
- 30 October 2029
- Connection site
- Friston 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The connection site could not be placed on the map.
Other projects at Friston 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem