Woburn Solar Farm

Woburn Solar Farm is a 840 MW solar project in planning, connecting to the National Grid (England & Wales) network at Dunstable 400kV Substation, with capacity due from October 2031. The connection agreement is held by SolarThree Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003033
Customer
SolarThree Ltd
Technology
PV Array (Photo Voltaic/solar)
Total capacity
840 MW
Change in this agreement
+840 MW
Capacity effective from
31 October 2031
Connection site
Dunstable 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Dunstable Β· Grid map

Other projects at Dunstable 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem