🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Sweet Briar Energy Park

Sweet Briar Energy Park is a 800 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at South Humber Connection Node A, with capacity due from October 2035. The connection agreement is held by Sweet Briar 2 Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2035 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-005055
Customer
Sweet Briar 2 Energy Park Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
800 MW
Change in this agreement
+800 MW
Capacity effective from
30 October 2035
Connection site
South Humber Connection Node A
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near South Humber Connection Node A · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem