Keadby North Power Station

Keadby North Power Station is a 892 MW gas project in planning, connecting to the National Grid (England & Wales) network at Keadby 400kV Substation, with capacity due from October 2031. The connection agreement is held by Keadby Generation Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001980
Customer
Keadby Generation Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
892 MW
Change in this agreement
+892 MW
Capacity effective from
31 October 2031
Connection site
Keadby 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Keadby Β· Grid map

Other projects at Keadby 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem