NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue on the SP Transmission (south Scotland) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Lamford Hill Solar + storage · Benbrack Wind Farm Limited |
20 MW | Scoping |
| Tralorg Wind Farm Onshore wind · Tralorg Wind Farm Limited |
20 MW | |
| Crystal Rig III Wind Farm Onshore wind · Crystal Rig III Limited |
14 MW | |
| Dealanach WLC WF Onshore wind · Dealanach Limited |
12 MW | Scoping |
| Dersalloch Wind Farm Extension Battery storage · Scottish Power Renewables (UK) Limited |
11 MW | Scoping |
| Enoch Hill 2 Wind Farm Wind + storage · RWE Renewables UK Onshore Wind Limited |
10 MW | Awaiting Consents |
| Elvanfoot (9.8 MW) Energy Storage Battery storage · Elvanfoot Energy Storage Limited |
9.8 MW | Consents Approved |
| Pogbie Wind Farm Onshore wind · Pogbie Wind Farm (Grid) Limited |
9.6 MW | |
| Hunterston Hydrogen Hydro and pumped storage · Statkraft Hydrogen UK Holding Limited |
5 MW | Scoping |
| Craig II Wind Farm Onshore wind · Craig Wind Farm Limited |
4.7 MW | |
| Keith Hill Wind Farm Onshore wind · Diamond Wind Limited |
4.5 MW | |
| Whitelaw Brae BESS Battery storage · Buk23 Limited |
1 MW | Under Construction/Commissioning |
| Ayrshire Grid Services Facility Other · Hunterston Grid 3 Ltd |
0 MW | Consents Approved |
| Hunterston Nuclear · Nuclear Restoration Services Limited |
0 MW | |
| Fife Grid Services Other · Kincardine Grid 3 Ltd |
0 MW | Scoping |
| Gretna Synchronous Compensation Other · Gretna Grid Services Limited |
0 MW | |
| Neilston Synchronous Compensation Other · Neilston Grid Services Limited |
0 MW | Consents Approved |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.