🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content Skip to project content
GENERATION · NETWORKS · ELECTRICITY DEMAND

All energy projects

Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.

3,152Matching project records
3,152Operating records
0Construction or enabling works
July 2026Official renewable register edition
DESNZ tracks projects over 150 kW, with limitations for smaller historical projects. Rows represent planning records and may include linked applications, extensions and separate storage phases. Do not sum them as a definitive national fleet total.
Reset filters

Project map

Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.

Loading OpenStreetMap…

3,152 results

Understand capacity and annual energy →
Data centres

Vantage CWL1 Newport Campus

Operating
148 MW

Published IT capacity

Newport · Wales

Vantage Data Centers

The operator markets its CWL1 campus at Newport with 148 MW of capacity. This is a campus specification, not a published average electricity load. Additional AI deployments and phased expansion should be tracked separately from current consumption.

Interconnectors

Viking Link

Operating
1,400 MW

Transfer capacity

Bicker Fen, Lincolnshire ↔ Revsing, Denmark · United Kingdom

National Grid Ventures / partner operator

Viking Link is an operating international electricity connection. Power can move between markets rather than being generated by the cable. Availability, outages and market schedules determine the usable transfer on a particular day.

Data centres

VIRTUS Stockley Park Campus

Operating
112.5 MW

IT capacity

Greater London · England

VIRTUS

VIRTUS publishes 112.5 MW of IT capacity for Stockley Park. Cooling and other facility services require electricity in addition to IT load. Actual occupation and annual metered consumption are not disclosed by this capacity figure.

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.

The wider power system

Explore conventional and nuclear power stations, grid connections, renewable technology guides and source updates.

Read the scope, licences and refresh schedule