πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Offshore Wind

Walney Extension

Irish Sea, west of Barrow-in-Furness, Cumbria β€” 19 km offshore

Walney Extension was briefly the world's largest offshore wind farm on commissioning in 2018, and remains one of the UK's most productive at nearly 659 MW. Located in the Irish Sea west of Walney Island, it extends the cluster of Walney 1 and 2 wind farms developed earlier. The e…

Operational Β· Since 2018
659 MW
Installed Capacity
87
Turbines
600k
Homes Powered
2,300 GWh
Est. Annual Output
2018
Commissioned

πŸ“‹ Project Overview

Walney Extension was briefly the world's largest offshore wind farm on commissioning in 2018, and remains one of the UK's most productive at nearly 659 MW. Located in the Irish Sea west of Walney Island, it extends the cluster of Walney 1 and 2 wind farms developed earlier. The extension uses two turbine models β€” MHI Vestas V164-8.25 MW and Siemens SWT-7.0 β€” the first time two different turbine types were deployed on the same offshore project at commercial scale in the UK.

Site Schematic

β—„ SHORE (~19 km) NORTH SEA / IRISH SEA Turbine (MHI Vestas V164-8.25 (47) + Siemens SWT-7.0-154 (40)) Export cable

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

⚑ Key Facts

β†’ Was the world's largest offshore wind farm at commissioning in 2018
β†’ First UK project to mix two turbine models at commercial scale
β†’ 87 turbines across 149 kmΒ²
β†’ Part of the Walney Island wind cluster in the Irish Sea
β†’ ~600,000 homes powered by clean energy

πŸ”§ Technical Specifications

Capacity (MW)659 MW
No. of turbines/units87
Turbine / unit modelMHI Vestas V164-8.25 (47) + Siemens SWT-7.0-154 (40)
Unit capacity7.65 MW each
Rotor diameter164 m
Hub height107 m
Tip height189 m (approx)
Foundation typeMonopile
Water depth19–47 m
Distance from shore19 km
Site area149 kmΒ²
Annual output2,300 GWh/year
Homes powered600,000 homes

πŸ”Œ Grid Connection & Infrastructure

Grid connection pointHeysham, Lancashire onshore substation
Voltage132 kV
Export cable19 km subsea to onshore substation
CfD heldNo (merchant / PPA)

🏒 Development & Ownership

DeveloperØrsted (formerly DONG Energy)
Owner / operatorØrsted (50%), Greencoat UK Wind (25.1%), PFA (12.5%), PKA (12.5%)
Year consented2014
Construction started2016
Commissioned / target2018
Capex estimate~Β£1.3 billion
LocationIrish Sea, west of Barrow-in-Furness, Cumbria β€” 19 km offshore
RegionIrish Sea
Coordinates53.97Β°N, 3.64Β°W

πŸ“… Project Timeline

🌿 Environmental & Planning

Part of the Walney Island cluster. Cumulative environmental studies with Walney 1 & 2 informed consent. Seabird, marine mammal and benthic surveys conducted.