Wally Corner Landfill Site is a 7 MW solar farm project in South East. The applicant or operator on record is SBC Renewables. It is recorded as operational since March 2017. The determining authority is South Oxfordshire, reference P15/S2486/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 7 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | SBC Renewables |
| Owner / operator | SBC Renewables |
| Year consented | 2015 |
| Construction started | 2016 |
| Commissioned / target | 2017 |
| Location | Land off, Burcot Lane, Dorchester-on-Thames, Berinsfield, Wallingford, Oxfordshire, OX10 7 |
| Region | South East |
| Coordinates | 51.6573744Β°N, 1.1619457Β°W |