Land off, Burcot Lane, Dorchester-on-Thames, Berinsfield, Wallingford, Oxfordshire, OX10 7
Wally Corner Landfill Site is a 7 MW solar farm project in South East. The applicant or operator on record is SBC Renewables. It is recorded as operational since March 2017. The determining authority is South Oxfordshire, reference P15/S2486/FUL.β¦
OperationalΒ· Since 2017
Project stageOperating
PlanningJul 2015 (completed)
ConsentedSep 2015 (completed)
ConstructionOct 2016 (completed)
OperatingMar 2017 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2016-11-23.
Registered planning capacity; not measured generation.
Wally Corner Landfill Site is a 7 MW solar farm project in South East. The applicant or operator on record is SBC Renewables. It is recorded as operational since March 2017. The determining authority is South Oxfordshire, reference P15/S2486/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
7.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
SBC Renewables
Owner / operator
SBC Renewables
Year consented
2015
Construction started
2016
Commissioned / target
2017
Location
Land off, Burcot Lane, Dorchester-on-Thames, Berinsfield, Wallingford, Oxfordshire, OX10 7