United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

SOLAR Β· SOUTHEAST

Solar project 113, Polk County

Solar project 113, Polk County is a 18.0 MW solar request withdrawn in the Southeast interconnection queue, in Polk County, Florida, connecting to Tampa Electric Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
113
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tampa Electric Company
Connection point (POI)
Pebbledale Substation, Polk County, Florida
Location
Polk County, Florida
Technology
Solar: 18.0 MW
Total requested
18.0 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
10 July 2024
Proposed online date
October 2025

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem