| Project | Capacity | Status |
|---|---|---|
| Yuha Desert Battery Storage Battery storage |
633 MW | In study |
| Battery storage project 622, Malheur County Battery storage ยท Owyhee Energy Storage, LLC |
600 MW | Agreement signed |
| Battery storage project IC-974, Fulton County Battery storage |
600 MW | Paused / redesign |
| Sagebrush Energy Storage Battery storage |
528 MW | In study |
| Alta Casa Storage Battery storage |
515 MW | Agreement signed |
| Greasewood Energy Storage Battery storage |
513 MW | Agreement signed |
| Conduit Energy Storage Battery storage |
513 MW | Agreement signed |
| Rosa Storage Battery storage |
512 MW | In study |
| Battery Storage Battery storage |
508 MW | Agreement signed |
| Lock Storage Battery storage |
508 MW | Agreement signed |
| Drifter Energy Storage Battery storage |
505 MW | Agreement signed |
| Spectrum Energy Storage Battery storage |
504 MW | Agreement signed |
| Delilah Energy Storage Battery storage |
504 MW | Agreement signed |
| Battery storage project Q84, San Bernardino County Battery storage |
500 MW | In study |
| Corby 2 Battery storage |
476 MW | In study |
| Tolenas Battery storage |
417 MW | In study |
| BRP Artemis BESS Battery storage ยท BRP Artemis BESS LLC |
411 MW | In study |
| BRP Snowdon BESS Battery storage ยท BRP SNOWDON BESS LLC |
411 MW | In study |
| Dos Palmas Battery storage |
411 MW | Agreement signed |
| BRP Mekong BESS Battery storage ยท BRP Mekong BESS LLC |
410 MW | In study |
| Beacon Storage Battery storage ยท AES Distributed Energy, Inc |
409 MW | In study |
| Sigma Storage Battery storage ยท AES Distributed Energy, Inc |
408 MW | In study |
| Hidalgo Energy Storage Battery storage |
408 MW | Agreement signed |
| Simon Battery storage |
406 MW | In study |
| Gabriel Storage Battery storage |
406 MW | Agreement signed |
| Trolley Battery storage |
406 MW | Agreement signed |
| Coral Reef Battery storage |
406 MW | In study |
| Fleetwood Battery storage |
406 MW | In study |
| Marici Battery storage |
406 MW | Agreement signed |
| Dirac Battery storage |
403 MW | In study |
| Merope BESS Battery storage ยท BRP Merope BESS LLC |
402 MW | In study |
| Battery storage project 21-104, Washington County Battery storage |
400 MW | Agreement signed |
| Battery storage project J2304, Columbia County Battery storage |
400 MW | In study |
| Brushy Battery storage |
400 MW | In study |
| Battery storage project Company 206, Clark County Battery storage |
400 MW | Paused / redesign |
| Golden Flats Battery storage |
365 MW | Agreement signed |
| Espresso Battery storage |
365 MW | Agreement signed |
| Northeast Central Valley Battery storage |
365 MW | In study |
| Allegheny Energy Storage Battery storage |
353 MW | Agreement signed |
| Battery storage project GEN-2021-005, Saline County Battery storage |
350 MW | Agreement signed |
| Cargo Storage Battery storage |
313 MW | In study |
| Haven Storage Battery storage |
313 MW | Agreement signed |
| Bell Bluff Storage Battery storage |
313 MW | In study |
| Platinum Storage Battery storage ยท Platinum Energy Storage LLC |
310 MW | Agreement signed |
| Harmony Storage 2 Battery storage |
308 MW | In study |
| Larkspur Energy Storage Battery storage ยท Larkspur Energy Storage LLC |
308 MW | Agreement signed |
| Lite Brite Battery Storage Battery storage |
306 MW | Agreement signed |
| Gnarly Osage Battery storage |
304 MW | In study |
| BRP Aras BESS Battery storage ยท BRP Aras BESS LLC |
304 MW | In study |
| Elion Energy Storage Battery storage |
302 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)84 ยท 22.6 GW
- ERCOT (Texas)71 ยท 12.8 GW
- West (non-ISO utilities)53 ยท 9,452 MW
- MISO (Midcontinent)20 ยท 2,570 MW
- SPP (Southwest Power Pool)14 ยท 2,279 MW
- ISO-NE (New England)6 ยท 1,678 MW
- Southeast (non-ISO utilities)5 ยท 1,026 MW
- PJM (Mid-Atlantic, Midwest)14 ยท 890 MW
- NYISO (New York)3 ยท 160 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)