๐Ÿ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more โ†’ Skip to main content

United States โ€บ Grid โ€บ Interconnection queues

OCTARY USA ยท INTERCONNECTION QUEUES

Battery storage interconnection queue in the USA (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown27053.5 GW
Active in queue53.5 GW270 requests
Agreement signed23.3 GW102 requests
Withdrawn59386.2 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

270 requests ยท page 1 of 6
ProjectCapacityStatusLocationRegionQueuedOnline
Yuha Desert Battery Storage
Battery storage
633 MWIn study Imperial, CACAISO Apr 2021target 2031
Battery storage project 622, Malheur County
Battery storage ยท Owyhee Energy Storage, LLC
600 MWAgreement signed Malheur, ORWest Oct 2021target 2029
Battery storage project IC-974, Fulton County
Battery storage
600 MWPaused / redesign Fulton, GASoutheast Jul 2021target 2025
Sagebrush Energy Storage
Battery storage
528 MWIn study Kern, CACAISO Apr 2021target 2033
Alta Casa Storage
Battery storage
515 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Greasewood Energy Storage
Battery storage
513 MWAgreement signed Kern, CACAISO Apr 2021target 2033
Conduit Energy Storage
Battery storage
513 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Rosa Storage
Battery storage
512 MWIn study Ventura, CACAISO Apr 2021target 2034
Battery Storage
Battery storage
508 MWAgreement signed Middlesex, MAISO-NE Jun 2021target 2028
Lock Storage
Battery storage
508 MWAgreement signed Fresno, CACAISO Apr 2021target 2027
Drifter Energy Storage
Battery storage
505 MWAgreement signed Ventura, CACAISO Apr 2021target 2033
Spectrum Energy Storage
Battery storage
504 MWAgreement signed Alameda, CACAISO Apr 2021target 2032
Delilah Energy Storage
Battery storage
504 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Battery storage project Q84, San Bernardino County
Battery storage
500 MWIn study San Bernardino, CAWest Oct 2021target 2024
Corby 2
Battery storage
476 MWIn study Solano, CACAISO Apr 2021target 2031
Tolenas
Battery storage
417 MWIn study Solano, CACAISO Apr 2021target 2031
BRP Artemis BESS
Battery storage ยท BRP Artemis BESS LLC
411 MWIn study Grimes, TXERCOT Dec 2021target 2028
BRP Snowdon BESS
Battery storage ยท BRP SNOWDON BESS LLC
411 MWIn study Briscoe, TXERCOT Sep 2021target 2028
Dos Palmas
Battery storage
411 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
BRP Mekong BESS
Battery storage ยท BRP Mekong BESS LLC
410 MWIn study Robertson, TXERCOT Dec 2021target 2027
Beacon Storage
Battery storage ยท AES Distributed Energy, Inc
409 MWIn study Harris, TXERCOT May 2021target 2029
Sigma Storage
Battery storage ยท AES Distributed Energy, Inc
408 MWIn study Harris, TXERCOT May 2021target 2029
Hidalgo Energy Storage
Battery storage
408 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2033
Simon
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Gabriel Storage
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2033
Trolley
Battery storage
406 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Coral Reef
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Fleetwood
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Marici
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Merope BESS
Battery storage ยท BRP Merope BESS LLC
402 MWIn study Comanche, TXERCOT Dec 2021target 2028
Battery storage project 21-104, Washington County
Battery storage
400 MWAgreement signed Washington, ORWest Aug 2021target 2028
Battery storage project J2304, Columbia County
Battery storage
400 MWIn study Columbia, WIMISO Dec 2021target 2024
Brushy
Battery storage
400 MWIn study Solano, CACAISO Apr 2021target 2031
Battery storage project Company 206, Clark County
Battery storage
400 MWPaused / redesign Clark, NVWest Sep 2021target 2029
Golden Flats
Battery storage
365 MWAgreement signed Stanislaus, CACAISO Apr 2021target 2031
Espresso
Battery storage
365 MWAgreement signed Alameda, CACAISO Apr 2021target 2031
Northeast Central Valley
Battery storage
365 MWIn study San Joaquin, CACAISO Apr 2021target 2031
Allegheny Energy Storage
Battery storage
353 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Battery storage project GEN-2021-005, Saline County
Battery storage
350 MWAgreement signed Saline, KSSPP May 2021target 2030
Cargo Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2036
Haven Storage
Battery storage
313 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Bell Bluff Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2035
Platinum Storage
Battery storage ยท Platinum Energy Storage LLC
310 MWAgreement signed Fannin, TXERCOT Sep 2021target 2026
Harmony Storage 2
Battery storage
308 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Larkspur Energy Storage
Battery storage ยท Larkspur Energy Storage LLC
308 MWAgreement signed Upton, TXERCOT Aug 2021target 2027
Lite Brite Battery Storage
Battery storage
306 MWAgreement signed Suffolk, MAISO-NE Jul 2021target 2028
Gnarly Osage
Battery storage
304 MWIn study San Diego, CACAISO Apr 2021target 2027
BRP Aras BESS
Battery storage ยท BRP Aras BESS LLC
304 MWIn study Upton, TXERCOT May 2021target 2028
Elion Energy Storage
Battery storage
302 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2034
Page 1 of 6

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)