United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Other interconnection queue in Texas

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown233,395 MW
Active in queue3,395 MW23 requests
Agreement signed30.0 MW3 requests
Withdrawn13017.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

23 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Southeast Oklahoma Pumped Storage
Other Β· Apex Energy Solutions, LLC
1,232 MWIn study Lamar, TXERCOT Aug 2022target 2030
SP Jaguar BESS
Other Β· PP Jaguar BESS LLC
300 MWPaused / redesign Mclennan, TXERCOT Mar 20212025
Rio Grand Valley Element Fuels Power
Other Β· Element H2Gen, LLC
230 MWIn study Cameron, TXERCOT Jun 2024target 2027
Masroor Storage
Other Β· Masroor Energy Storage LLC
203 MWPaused / redesign Fannin, TXERCOT Nov 2021target 2025
Snap Jaw BESS
Other Β· Moccasin Pointe Grid, LLC
201 MWPaused / redesign Harris, TXERCOT Apr 2021target 2028
Other project GEN-2023-059, Harrison County
Other
200 MWIn study Harrison, TXSPP Sep 2023target 2029
Heartfield Storage
Other Β· Belltown Power Texas
152 MWPaused / redesign Hidalgo, TXERCOT Sep 2021target 2023
Kodiak AGR1
Other Β· Hunt Energy Network, LLC
132 MWIn study Reeves, TXERCOT Feb 2024target 2027
Fort Duncan BESS
Other Β· Fort Duncan BESS LLC
106 MWPaused / redesign Maverick, TXERCOT Aug 20212025
Estonian Storage
Other Β· 249RD 8ME
103 MWPaused / redesign Delta, TXERCOT Jan 2020target 2022
Echols Creek Storage
Other Β· BT Ferguson Solar, LLC
101 MWPaused / redesign Lamar, TXERCOT Apr 2023target 2027
San Bernard Storage
Other Β· San Bernard Storage, LLC
101 MWPaused / redesign Wharton, TXERCOT Nov 2019target 2022
HIP ESS Project
Other
60.0 MWPaused / redesign Leon, TXERCOT
Tokyo TxHSR TPSS EW-1
Other Β· Texas Central Rail Holdings, LLC
50.0 MWIn study Ellis, TXERCOT Jan 2019target 2028
Atlanta TxHSR TPSS DS-1
Other Β· Texas Central Rail Holdings, LLC
50.0 MWIn study Dallas, TXERCOT Jan 2019target 2028
Barcelona TxHSR TPSS HN-4
Other Β· Texas Central Rail Holdings, LLC
50.0 MWIn study Harris, TXERCOT Jan 2019target 2028
Turin TxHSR TPSS HN-6
Other Β· Texas Central Rail Holdings, LLC
50.0 MWIn study Grimes, TXERCOT Sep 2019target 2028
Knickerbocker Storage
Other Β· Knickerbocker Solar LLC
25.0 MWPaused / redesign Tom Green, TXERCOT Dec 2019target 2028
Harris Spencer BESS
Other Β· Harris Spencer BESS, LLC
10.0 MWPaused / redesign Harris, TXERCOT Mar 20232025
Pleasanton BESS
Other
10.0 MWPaused / redesign Atascosa, TXERCOT
Olney AGR1
Other Β· HEN INFRASTRUCTURE, LLC 1
10.0 MWAgreement signed Young, TXERCOT target 2026
Saddleback AGR1
Other Β· HEN INFRASTRUCTURE, LLC 1
10.0 MWAgreement signed Reeves, TXERCOT target 2026
Coyote Springs AGR1
Other Β· HEN INFRASTRUCTURE, LLC 1
10.0 MWAgreement signed Reeves, TXERCOT target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)