Completed queue projects in Texas (2023 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown25511 MW
Active in queue79.0 GW369 requests
Agreement signed25.0 GW108 requests
Withdrawn11324.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

25 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Longbow BESS
Other Β· Longbow BESS, LLC
181 MWOperating Brazoria, TXERCOT Jan 20232024
Brotman U1 U2 Power Station
Gas
102 MWOperating Brazoria, TXERCOT Mar 20232023
Pauline BESS
Other Β· HEN INFRASTRUCTURE LLC 1
10.0 MWOperating Henderson, TXERCOT Jun 20232024
Garden City East BESS
Other Β· HEN Infrastructure, LLC 2
10.0 MWOperating Glasscock, TXERCOT Jan 20232024
Lufkin South BESS
Other Β· HEN INFRASTRUCTURE LLC 1
10.0 MWOperating Angelina, TXERCOT Jun 20232024
Rodeo Ranch Energy Storage Repowering
Battery storage
10.0 MWOperating Reeves, TXERCOT Aug 20232025
Judkins BESS
Other Β· HEN INFRASTRUCTURE LLC 1
10.0 MWOperating Ector, TXERCOT Jun 20232024
Mineral Wells East BESS
Other Β· HEN Infrastructure, LLC 2
10.0 MWOperating Palo Pinto, TXERCOT Jan 20232024
Midway1 BESS
Other Β· Midway BESS Station LLC
10.0 MWOperating Ector, TXERCOT May 20232023
Farmersville West BESS 2
Battery storage Β· SBESS TX 7 LLC
9.9 MWOperating Collin, TXERCOT Jun 20232025
Regis Palacios BESS
Other Β· Regis Palacios, LLC
9.9 MWOperating Matagorda, TXERCOT Apr 20232024
Cisco BESS
Other Β· HEN INFRASTRUCTURE LLC 1
9.9 MWOperating Eastland, TXERCOT Jun 20232024
Crosby BESS
Battery storage Β· Harris Centerpoint BESS LLC
9.9 MWOperating Harris, TXERCOT Mar 20232025
Century BESS
Other Β· ESTX-PLD-GRANDPRAIRIE1, LLC
9.9 MWOperating Tarrant, TXERCOT Aug 20232024
Mainland BESS
Other Β· HEN INFRASTRUCTURE LLC 1
9.9 MWOperating Galveston, TXERCOT Aug 20232024
Gregory BESS
Other Β· Regis Gregory, LLC
9.9 MWOperating San Patricio, TXERCOT Jul 20232024
Pavlov BESS
Other Β· HEN INFRASTRUCTURE LLC 1
9.9 MWOperating Matagorda, TXERCOT Aug 20232024
Weil Tract BESS
Other Β· HEN Infrastructure, LLC 2
9.9 MWOperating Nueces, TXERCOT Jan 20232024
Citrus City BESS
Battery storage Β· SBESS TX10 LLC
9.9 MWOperating Hidalgo, TXERCOT Jun 20232025
Russek Street BESS
Other Β· HEN INFRASTRUCTURE LLC 1
9.9 MWOperating Reagan, TXERCOT Aug 20232024
Continental BESS
Other Β· Regis Continental, LLC
9.8 MWOperating Starr, TXERCOT May 20232024
Moore Field BESS 2
Other Β· Regis Monte Cristo LLC
9.8 MWOperating Hidalgo, TXERCOT Jul 20232024
Falfur BESS
Battery storage Β· Regis Falfurrias, LLC
9.8 MWOperating Brooks, TXERCOT Jun 20232025
Fort Mason BESS
Other Β· Regis Mason LLC
9.8 MWOperating Mason, TXERCOT Aug 20232024
Texas Bluebonnet Solar
Solar Β· Texas Bluebonnet Solar Partners, LLC
9.7 MWOperating Mclennan, TXERCOT May 20232025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)