United States βΊ Grid βΊ Interconnection queues βΊ Texas
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Texas (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Longbow BESS Other Β· Longbow BESS, LLC |
181 MW | |
| Brotman U1 U2 Power Station Gas |
102 MW | |
| Pauline BESS Other Β· HEN INFRASTRUCTURE LLC 1 |
10.0 MW | |
| Garden City East BESS Other Β· HEN Infrastructure, LLC 2 |
10.0 MW | |
| Lufkin South BESS Other Β· HEN INFRASTRUCTURE LLC 1 |
10.0 MW | |
| Rodeo Ranch Energy Storage Repowering Battery storage |
10.0 MW | |
| Judkins BESS Other Β· HEN INFRASTRUCTURE LLC 1 |
10.0 MW | |
| Mineral Wells East BESS Other Β· HEN Infrastructure, LLC 2 |
10.0 MW | |
| Midway1 BESS Other Β· Midway BESS Station LLC |
10.0 MW | |
| Farmersville West BESS 2 Battery storage Β· SBESS TX 7 LLC |
9.9 MW | |
| Regis Palacios BESS Other Β· Regis Palacios, LLC |
9.9 MW | |
| Cisco BESS Other Β· HEN INFRASTRUCTURE LLC 1 |
9.9 MW | |
| Crosby BESS Battery storage Β· Harris Centerpoint BESS LLC |
9.9 MW | |
| Century BESS Other Β· ESTX-PLD-GRANDPRAIRIE1, LLC |
9.9 MW | |
| Mainland BESS Other Β· HEN INFRASTRUCTURE LLC 1 |
9.9 MW | |
| Gregory BESS Other Β· Regis Gregory, LLC |
9.9 MW | |
| Pavlov BESS Other Β· HEN INFRASTRUCTURE LLC 1 |
9.9 MW | |
| Weil Tract BESS Other Β· HEN Infrastructure, LLC 2 |
9.9 MW | |
| Citrus City BESS Battery storage Β· SBESS TX10 LLC |
9.9 MW | |
| Russek Street BESS Other Β· HEN INFRASTRUCTURE LLC 1 |
9.9 MW | |
| Continental BESS Other Β· Regis Continental, LLC |
9.8 MW | |
| Moore Field BESS 2 Other Β· Regis Monte Cristo LLC |
9.8 MW | |
| Falfur BESS Battery storage Β· Regis Falfurrias, LLC |
9.8 MW | |
| Fort Mason BESS Other Β· Regis Mason LLC |
9.8 MW | |
| Texas Bluebonnet Solar Solar Β· Texas Bluebonnet Solar Partners, LLC |
9.7 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)