🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OTHER · ERCOT

Regis Palacios BESS

Regis Palacios BESS is a 9.9 MW other request built and operating in the ERCOT interconnection queue, in Matagorda County, Texas.

Queue statusOperating
  1. PlanningQueued Apr 2023 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 2024 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
22INR0602
Grid region
ERCOT (Texas)
Developer
Regis Palacios, LLC
Connection point (POI)
Station Name (TSP STATION CODE): Palacios_x000D_ Load Name or Load Transformer name: 69_12_2_x000D_ Bus# PTI Bus number: 8131_x000D_ Voltage Transmission level kV: 69kV
Location
Matagorda County, Texas
Technology
Other: 9.9 MW
Total requested
9.9 MW
Study phase
MRD Approved
Queue status
Operational
Entered queue
7 April 2023
Proposed online date
November 2024
Came online
November 2024

Location

Marker shows the centre of Matagorda County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Matagorda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem