Cisco BESS is a 9.9 MW other request built and operating in the ERCOT interconnection queue, in Eastland County, Texas.
Request details
- Queue ID
- 24INR0588
- Grid region
- ERCOT (Texas)
- Developer
- HEN INFRASTRUCTURE LLC 1
- Connection point (POI)
- LD02/6317/CISC
- Location
- Eastland County, Texas
- Technology
- Other: 9.9 MW
- Total requested
- 9.9 MW
- Study phase
- MRD Approved
- Queue status
- Operational
- Entered queue
- 12 June 2023
- Agreement signed
- 19 July 2023
- Proposed online date
- October 2024
- Came online
- May 2024
Location
Marker shows the centre of Eastland County; the queue data does not give exact sites.
Other requests in Eastland County
- Anchor Wind IIIOnshore wind Β· 16.0 MW Β· agreement signed
- Silver Star repowerOnshore wind Β· -7.2 MW Β· agreement signed
- Damia SolarSolar + storage Β· 306 MW Β· in study
- Basketflower SolarSolar + storage Β· 183 MW Β· in study
- Damia StorageSolar + storage Β· 153 MW Β· in study
- Star Grass Renewable Energy Solar SLFSolar + storage Β· 150 MW Β· in study
- Basketflower StorageSolar + storage Β· 92.0 MW Β· in study
- Roadrunner Crossing Wind (Uprate)Wind + storage Β· 3.3 MW Β· in study
- Anchor Wind IIOnshore wind Β· 129 MW Β· built
- Roadrunner Crossing Wind SLFWind + storage Β· 128 MW Β· built
- Roadrunner Crossing Wind II SLFOnshore wind Β· 127 MW Β· built
- Anchor WindOnshore wind Β· 98.9 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem