United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTContinental BESS
Continental BESS is a 9.8 MW other request built and operating in the ERCOT interconnection queue, in Starr County, Texas.
Request details
- Queue ID
- 23INR0543
- Grid region
- ERCOT (Texas)
- Developer
- Regis Continental, LLC
- Connection point (POI)
- Station Name (TDSP Station Code): CONTINEN_x000D_ Load/Load Transformer Name: 69_12_x000D_ PTI BUS number: #8799_x000D_ Voltage in kV (Transmission Level): 69 kV
- Location
- Starr County, Texas
- Technology
- Other: 9.8 MW
- Total requested
- 9.8 MW
- Study phase
- MRD Approved
- Queue status
- Operational
- Entered queue
- 24 May 2023
- Proposed online date
- May 2024
- Came online
- July 2024
Location
Marker shows the centre of Starr County; the queue data does not give exact sites.
Other requests in Starr County
- Half Moon SolarSolar Β· 513 MW Β· agreement signed
- Bullring Wind 2Onshore wind Β· 304 MW Β· agreement signed
- Bullring Wind 1Onshore wind Β· 304 MW Β· agreement signed
- Diamondback solarSolar Β· 204 MW Β· agreement signed
- Mesteno WindOnshore wind Β· 202 MW Β· agreement signed
- Bullring Wind 3Onshore wind Β· 190 MW Β· agreement signed
- Starr Solar RanchSolar + storage Β· 137 MW Β· agreement signed
- Fierce River SolarSolar + storage Β· 896 MW Β· in study
- Muy Grande SolarSolar Β· 503 MW Β· in study
- Mandolin Solar SLFSolar + storage Β· 300 MW Β· in study
- Fierce River BESSSolar + storage Β· 285 MW Β· in study
- Bessie StorageBattery storage Β· 211 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem