United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTFalfur BESS
Falfur BESS is a 9.8 MW battery storage request built and operating in the ERCOT interconnection queue, in Brooks County, Texas.
Request details
- Queue ID
- 24INR0593
- Grid region
- ERCOT (Texas)
- Developer
- Regis Falfurrias, LLC
- Connection point (POI)
- Connected to AEP 12.47kV Station Name (TDSP Station Code): FALFUR Load/Load Transformer Name: R1 PTI Bus Number: #8510 Voltage in kV (Transmission Level): 138kV
- Location
- Brooks County, Texas
- Technology
- Battery: 9.8 MW
- Total requested
- 9.8 MW
- Study phase
- MRD Approved
- Queue status
- Operational
- Entered queue
- 27 June 2023
- Agreement signed
- 21 June 2024
- Proposed online date
- August 2025
- Came online
- February 2025
Location
Marker shows the centre of Brooks County; the queue data does not give exact sites.
Other requests in Brooks County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem