πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Georgia

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Georgia (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown165,688 MW
Active in queue14.4 GW33 requests
Agreement signed8,567 MW16 requests
Withdrawn143,473 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

16 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Smarr CC
Gas
2,000 MWIn study Monroe, GASoutheast Aug 2024target 2028
Flint River 780 MW Unit
Gas
780 MWIn study Mitchell, GASoutheast Oct 2024target 2029
Gas project IC-1260, Effingham County
Gas
722 MWIn study Effingham, GASoutheast Mar 2024target 2031
TOCE GA Solar 4
Solar + storage
325 MWIn study Jefferson, GASoutheast Jan 2024target 2027
Talbot U7
Gas
250 MWIn study Talbot, GASoutheast Aug 2024target 2029
Washington County Solar
Solar + storage
203 MWIn study Washington, GASoutheast Oct 2024target 2027
Battery storage project IC-1272, Paulding County
Battery storage
200 MWIn study Paulding, GASoutheast Mar 2024target 2030
SR Bartown frmly Jefferson
Solar
200 MWIn study Jefferson, GASoutheast Dec 2024target 2029
SR Wrens
Solar
194 MWIn study Jefferson, GASoutheast Dec 2024target 2029
SR Norwood II
Solar
143 MWIn study Warren, GASoutheast Dec 2024target 2028
Spain Energy Center
Solar + storage
141 MWIn study Brooks, GASoutheast Jan 2024target 2028
SR Warthen
Solar
135 MWIn study Washington, GASoutheast Dec 2024target 2029
SR Doerun
Solar
130 MWIn study Colquitt, GASoutheast Dec 2024target 2029
Rebecca Solar
Solar
120 MWIn study Turner, GASoutheast Dec 2024target 2028
Scarboro Solar
Solar + storage
75.0 MWIn study Miller, GASoutheast Dec 2024target 2031
Altamaha Green Energy
Other
70.0 MWIn study Wayne, GASoutheast Aug 2024target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)