United States › Grid › Interconnection queues › Georgia

SOLAR · SOUTHEAST

Rebecca Solar

Rebecca Solar is a 120 MW solar request in interconnection study in the Southeast interconnection queue, in Turner County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Dec 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-199
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
North Tifton - Pitts 230 kV line
Location
Turner County, Georgia
Technology
Solar: 120 MW
Total requested
120 MW
Study phase
System Impact Study
Queue status
Active
Entered queue
11 December 2024
Proposed online date
December 2028

Location

Marker shows the centre of Turner County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Turner County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem