United States › Grid › Interconnection queues › Georgia
SOLAR · SOUTHEASTSR Doerun
SR Doerun is a 130 MW solar request in interconnection study in the Southeast interconnection queue, in Colquitt County, Georgia, connecting to Georgia Transmission.
Queue statusIn planning
- PlanningQueued Dec 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GI-203
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Mitchell - Moultrie 115 kV Line
- Location
- Colquitt County, Georgia
- Technology
- Solar: 130 MW
- Total requested
- 130 MW
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 18 December 2024
- Proposed online date
- December 2029
Location
Marker shows the centre of Colquitt County; the queue data does not give exact sites.
Other requests in Colquitt County
- Odom Solar (aka Peachtree Solar)Solar · 22.0 MW · built
- Solar project IC-623, Colquitt CountySolar · 90.5 MW · withdrawn
- Solar project IC-614, Colquitt CountySolar · 40.0 MW · withdrawn
- Solar project IC-360, Colquitt CountySolar · 20.0 MW · withdrawn
- Solar project IC-357, Colquitt CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem