United States › Grid › Interconnection queues › Georgia
SOLAR + STORAGE · SOUTHEASTScarboro Solar
Scarboro Solar is a 75.0 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Miller County, Georgia, connecting to Georgia Transmission.
Queue statusIn planning
- PlanningQueued Dec 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Feb 2031 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GI-200
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Grove Church 115 kV Substation
- Location
- Miller County, Georgia
- Technology
- Solar: 75.0 MW · Battery
- Total requested
- 75.0 MW
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 17 December 2024
- Proposed online date
- February 2031
Location
Marker shows the centre of Miller County; the queue data does not give exact sites.
Other requests in Miller County
- Solar project IC-911, Miller CountySolar · 220 MW · withdrawn
- Solar project IC-701, Miller CountySolar · 200 MW · withdrawn
- Other project 25-IC-BF, Miller CountyOther · 199 MW · withdrawn
- Solar + storage project IC-835, Miller CountySolar + storage · 80.0 MW · withdrawn
- Solar + storage project IC-834, Miller CountySolar + storage · 70.0 MW · withdrawn
- Solar project IC-629, Miller CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem