United States βΊ Grid βΊ Interconnection queues βΊ Georgia
SOLAR Β· SOUTHEASTSolar project IC-911, Miller County
Solar project IC-911, Miller County is a 220 MW solar request withdrawn in the Southeast interconnection queue, in Miller County, Georgia, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2020 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-911
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Farley - South Bainbridge 230 kV Line
- Location
- Miller County, Georgia
- Technology
- Solar: 220 MW
- Total requested
- 220 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 29 October 2020
- Proposed online date
- May 2025
- Withdrawn
- April 2025
Location
Marker shows the centre of Miller County; the queue data does not give exact sites.
Other requests in Miller County
- Scarboro SolarSolar + storage Β· 75.0 MW Β· in study
- Solar project IC-701, Miller CountySolar Β· 200 MW Β· withdrawn
- Other project 25-IC-BF, Miller CountyOther Β· 199 MW Β· withdrawn
- Solar + storage project IC-835, Miller CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project IC-834, Miller CountySolar + storage Β· 70.0 MW Β· withdrawn
- Solar project IC-629, Miller CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem