United States › Grid › Interconnection queues › Georgia
SOLAR + STORAGE · SOUTHEASTSpain Energy Center
Spain Energy Center is a 141 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Brooks County, Georgia, connecting to Georgia Transmission.
Queue statusIn planning
- PlanningQueued Jan 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GI-190
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Spain 230 kV Substation
- Location
- Brooks County, Georgia
- Technology
- Solar: 141 MW · Battery
- Total requested
- 141 MW
- Study phase
- Facilities Study
- Queue status
- Active
- Entered queue
- 9 January 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Brooks County; the queue data does not give exact sites.
Other requests in Brooks County
- Quitman IISolar · 150 MW · built
- Quitman SolarSolar · 150 MW · built
- Solar + storage project IC-847, Brooks CountySolar + storage · 175 MW · withdrawn
- Solar project IC-1033, Brooks CountySolar · 150 MW · withdrawn
- Solar project IC-649, Brooks CountySolar · 150 MW · withdrawn
- Solar project IC-674, Brooks CountySolar · 75.0 MW · withdrawn
- Solar project IC-376, Brooks CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem