🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Georgia

SOLAR · SOUTHEAST

SR Norwood II

SR Norwood II is a 143 MW solar request in interconnection study in the Southeast interconnection queue, in Warren County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Dec 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-206
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Sinquefield Road 115 kV Substation
Location
Warren County, Georgia
Technology
Solar: 143 MW
Total requested
143 MW
Study phase
System Impact Study
Queue status
Active
Entered queue
19 December 2024
Proposed online date
December 2028

Location

Marker shows the centre of Warren County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Warren County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem