United States › Grid › Interconnection queues › Georgia

SOLAR · SOUTHEAST

SR Norwood III

SR Norwood III is a 150 MW solar request in interconnection study in the Southeast interconnection queue, in Warren County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Jul 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-214
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Sinquefield Road 115 kV Substation
Location
Warren County, Georgia
Technology
Solar: 150 MW
Total requested
150 MW
Study phase
Application under Review
Queue status
Active
Entered queue
9 July 2025
Proposed online date
December 2029

Location

Marker shows the centre of Warren County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Warren County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem