Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown143,601 MW
Active in queue3,601 MW14 requests
Agreement signed555 MW1 requests
Withdrawn7337.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

14 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project JEA-Q008, Duval County
Gas
645 MWIn study Duval, FLSoutheast Feb 2018target 2030
Gas project 137, Pasco County
Gas Β· Seminole Electric Cooperative, Inc.
575 MWUnder construction Pasco, FLSoutheast Nov 2015target 2020
Bull Creek (Osceola Generating Station)
Gas
555 MWAgreement signed Osceola, FLSoutheast Sep 2021target 2025
Gas project 4, Osceola County
Gas Β· Orlando Utilities Commission
537 MWIn study Osceola, FLSoutheast Apr 1999
Gas project FC100382, Osceola County
Gas Β· Duke Energy Florida, LLC
265 MWIn study Osceola, FLSoutheast Dec 2025target 2030
Gas project FC100386, Osceola County
Gas Β· Duke Energy Florida, LLC
265 MWIn study Osceola, FLSoutheast Dec 2025target 2030
Gas project 328, Pinellas County
Gas Β· Duke Energy Florida, LLC
172 MWUnder construction Pinellas, FLSoutheast Jun 2023target 2024
Gas project 22
Gas
136 MWIn study FLSoutheast Aug 2018target 2019
Gas project 118, Polk County
Gas
132 MWIn study Polk, FLSoutheast Apr 2025target 2026
Gas project 415, Manatee County
Gas Β· FPL
87.0 MWIn study Manatee, FLSoutheast Sep 2020target 2026
Gas project 333, Polk County
Gas Β· Duke Energy Florida, LLC
84.0 MWUnder construction Polk, FLSoutheast Jul 2023target 2025
Gas project 417, Volusia County
Gas Β· FPL
76.0 MWIn study Volusia, FLSoutheast Sep 2020target 2025
Gas project 419, Martin County
Gas Β· FPL
60.0 MWIn study Martin, FLSoutheast Sep 2020target 2026
Gas project FC100379, Orange County
Gas Β· Masked
12.0 MWIn study Orange, FLSoutheast Nov 2025target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)