United States › Grid › Interconnection queues › Florida
GAS · SOUTHEASTGas project 417, Volusia County
Gas project 417, Volusia County is a 76.0 MW gas request in interconnection study in the Southeast interconnection queue, in Volusia County, Florida, connecting to Florida Power & Light.
Queue statusIn planning
- PlanningQueued Sep 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 417
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Sanford Sub
- Location
- Volusia County, Florida
- Technology
- Gas: 76.0 MW
- Total requested
- 76.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Facility Study
- Queue status
- Active
- Entered queue
- 18 September 2020
- Proposed online date
- October 2025
Location
Marker shows the centre of Volusia County; the queue data does not give exact sites.
Other requests in Volusia County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem