United States βΊ Grid βΊ Interconnection queues
SOLAR Β· SOUTHEASTSolar project 180C
Solar project 180C is a 74.5 MW solar request built and operating in the Southeast interconnection queue, connecting to Duke Energy Florida.
Request details
- Queue ID
- 180C
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Highbanks Substation 115 kV
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 10 April 2017
- Proposed online date
- December 2018
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem