United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· SOUTHEAST

Solar project 180C

Solar project 180C is a 74.5 MW solar request built and operating in the Southeast interconnection queue, connecting to Duke Energy Florida.

Queue statusOperating
  1. PlanningQueued Apr 2017 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget Dec 2018 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
180C
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Duke Energy Florida, LLC
Connection point (POI)
Highbanks Substation 115 kV
Technology
Solar: 74.5 MW
Total requested
74.5 MW
Service type
Network resource (NRIS)
Study phase
IA Executed
Queue status
Operational
Entered queue
10 April 2017
Proposed online date
December 2018

Location

Marker shows the centre of County; the queue data does not give exact sites.

Power plants in Β· Transmission lines in

Other requests in County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem