πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Gas project 156, Volusia County

Gas project 156, Volusia County is a 655 MW gas request withdrawn in the Southeast interconnection queue, in Volusia County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
156
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Masked
Connection point (POI)
Debary Substation
Location
Volusia County, Florida
Technology
Gas: 655 MW
Total requested
655 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
1 September 2016
Proposed online date
June 2021

Location

Marker shows the centre of Volusia County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Volusia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem