United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Gas project 157, Volusia County

Gas project 157, Volusia County is a 1,174 MW gas request withdrawn in the Southeast interconnection queue, in Volusia County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
157
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Masked
Connection point (POI)
Debary Substation
Location
Volusia County, Florida
Technology
Gas: 1,174 MW
Total requested
1,174 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
21 September 2016
Proposed online date
June 2021

Location

Marker shows the centre of Volusia County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Volusia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem