πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Gas project 22

Gas project 22 is a 136 MW gas request in interconnection study in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusIn planning
  1. PlanningQueued Aug 2018 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2019 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
22
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
MGS Switchyard
Location
Florida
Technology
Gas: 136 MW
Total requested
136 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: System Impact; Status: Study Complete TSR Complete
Queue status
Active
Entered queue
30 August 2018
Proposed online date
December 2019

Location

No county location in the queue data.

Power plants in Florida Β· Transmission lines in Florida

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem