Gas project 22 is a 136 MW gas request in interconnection study in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.
Queue statusIn planning
- PlanningQueued Aug 2018 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2019 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 22
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Seminole Electric Cooperative
- Connection point (POI)
- MGS Switchyard
- Location
- Florida
- Technology
- Gas: 136 MW
- Total requested
- 136 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: System Impact; Status: Study Complete TSR Complete
- Queue status
- Active
- Entered queue
- 30 August 2018
- Proposed online date
- December 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem