United States โบ Grid โบ Interconnection queues โบ Pennsylvania
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in Pennsylvania, NYISO
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Tioga County Power Gas ยท ESC Tioga County Power, LLC |
550 MW | Withdrawn / abandoned |
| Renovo Energy Center Uprate Gas ยท Renovo Energy Center, LLC |
548 MW | Withdrawn / abandoned |
| Renovo Energy Center Gas ยท Renovo Energy Center, LLC |
504 MW | Withdrawn / abandoned |
| Shallow Seam BESS Battery storage ยท Shallow Seam Energy Storage |
400 MW | Withdrawn / abandoned |
| Black Cherry BESS Battery storage ยท Black Cherry Wind Power, LLC |
400 MW | Withdrawn / abandoned |
| PA-Hockenberry Solar ยท PA-Hockenberry |
400 MW | Withdrawn / abandoned |
| PA-Hockenberry LLC Solar ยท PA-Hockenberry LLC |
400 MW | Withdrawn / abandoned |
| Black Cherry Battery Battery storage ยท Black Cherry Wind Power |
400 MW | Withdrawn / abandoned |
| Black Cherry Wind 1 Onshore wind ยท Black Cherry Wind Power, LLC |
350 MW | Withdrawn / abandoned |
| McKean County Solar CSR Phase 2 Solar + storage ยท RWE Solar Development, LLC |
325 MW | Withdrawn / abandoned |
| McKean County Solar CSR Phase 1 Solar + storage ยท RWE Solar Development, LLC |
325 MW | Withdrawn / abandoned |
| Black Cherry Wind 1 Onshore wind ยท Black Cherry Wind Power |
300 MW | Withdrawn / abandoned |
| PA-Fritz Kiln LLC Solar ยท PA-Fritz Kiln LLC |
300 MW | Withdrawn / abandoned |
| Black Cherry Wind 2 Onshore wind ยท Black Cherry Wind Power |
300 MW | Withdrawn / abandoned |
| Seven Creek Energy - Squab Hollow Battery storage ยท Seven Creek Energy, LLC |
290 MW | Withdrawn / abandoned |
| Moonlight Flats Solar Power Solar ยท Swift Current Energy |
250 MW | Withdrawn / abandoned |
| Lewis Run - Pierce Brook 230 kV Solar ยท RWE Solar Development, LLC |
240 MW | Withdrawn / abandoned |
| Mineral Basin II Solar Power Solar ยท Mineral Basin Solar Power, LLC |
222 MW | Withdrawn / abandoned |
| Farmers Valley โรรฌ Ridgeway 115 kV Solar ยท RWE Solar Development, LLC |
200 MW | Withdrawn / abandoned |
| Armenia Mountain I Onshore wind ยท AES Keystone Wind, LLC |
175 MW | Withdrawn / abandoned |
| Lewis Run - Pierce Brook 230 kV Battery storage ยท RWE Solar Development, LLC |
170 MW | Withdrawn / abandoned |
| McKean County BESS Battery storage ยท RWE Solar Development, LLC |
170 MW | Withdrawn / abandoned |
| Black Cherry Wind 2 Onshore wind ยท Black Cherry Wind Power, LLC |
150 MW | Withdrawn / abandoned |
| Mainesburg ESS Battery storage ยท Juno Power Management LLC |
130 MW | Withdrawn / abandoned |
| Winner Solar Solar ยท Winner Solar, LLC |
120 MW | Withdrawn / abandoned |
| Winner Solar Solar ยท Winner Solar, LLC |
120 MW | Withdrawn / abandoned |
| Seward-Glory 115 kV Solar ยท Clark Run Solar LLC |
100 MW | Withdrawn / abandoned |
| Winterberry Wind Onshore wind ยท Winterberry Wind LLC |
100 MW | Withdrawn / abandoned |
| Cherry Flats Onshore wind ยท AES Keystone Wind, LLC |
90.0 MW | Withdrawn / abandoned |
| Pierce Brook-Lewis Run 230 kV Solar ยท McKean County Solar, LLC |
80.0 MW | Withdrawn / abandoned |
| Pierce Brook - Lewis Run 230 kV Solar ยท McKean County Solar, LLC |
80.0 MW | Withdrawn / abandoned |
| Armenia Mountain II Onshore wind ยท AES Keystone Wind, LLC |
75.0 MW | Withdrawn / abandoned |
| Winterberry Wind Onshore wind ยท Winterberry Wind LLC |
50.0 MW | Withdrawn / abandoned |
| Tennessee Gas-East Towanda 115 kV Solar ยท Agnes Solar, LLC |
48.0 MW | Withdrawn / abandoned |
| East Towanda-South Troy 115 kV Solar ยท Franklin Energy, LLC |
31.0 MW | Withdrawn / abandoned |
| East Towanda-South Troy 115 kV II Solar ยท Franklin Energy, LLC |
20.0 MW | Withdrawn / abandoned |
| Pierce Brook - Lewis Run 230 kV Battery storage ยท McKean County Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| Pierce Brook - Lewis Run 230 kV Solar ยท McKean County Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| South Troy - North Towanda 34.5 kV Solar ยท Franklin Energy, LLC |
20.0 MW | Withdrawn / abandoned |
| Pierce Brook-Lewis Run 230kV Battery storage ยท McKean County Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| Pierce Brook-Lewis Run 230kV Solar ยท McKean County Solar, LLC |
20.0 MW | Withdrawn / abandoned |
| Tennessee Gas-East Towanda 115 kV Solar ยท Agnes Solar, LLC |
10.0 MW | Withdrawn / abandoned |
| Oxbow 34.5 kV Solar ยท Field Brook Solar LLC |
9.8 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)1,309 ยท 154.9 GW
- NYISO (New York)43 ยท 8,533 MW
- MISO (Midcontinent)2 ยท 879 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)