ONSHORE WIND · NYISOArmenia Mountain II
Armenia Mountain II is a 75.0 MW onshore wind request withdrawn in the NYISO interconnection queue, in Bradford County, Pennsylvania, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2006 (completed)
- Withdrawn / abandonedApr 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 221
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- AES Keystone Wind, LLC
- Connection point (POI)
- Homer City-Watercure 345kV
- Location
- Bradford County, Pennsylvania
- Technology
- Wind: 75.0 MW
- Total requested
- 75.0 MW
- Queue status
- Withdrawn
- Entered queue
- 19 July 2006
- Withdrawn
- April 2009
Location
Marker shows the centre of Bradford County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Bradford County
- Farmers Valley SolarSolar · 20.0 MW · agreement signed
- Gas project AI2-022, Bradford CountyGas · 60.0 MW · in study
- Solar project AG2-356, Bradford CountySolar · 20.0 MW · in study
- Solar project AH2-036, Bradford CountySolar · 5.0 MW · in study
- Liberty/Asylum Township PlantGas · 850 MW · built
- Armenia Mountain WFOnshore wind · 100 MW · built
- Liberty/Asylum Township PlantGas · 57.5 MW · built
- Beaver Dam Generating StationGas · 19.9 MW · built
- Wyalusing 34.5kVGas · 19.9 MW · built
- Glory Barn Road Generating Facility AlpacaGas · 19.9 MW · built
- North Tier LFOther · 1.6 MW · built
- Wyalusing 34.5 kVGas · 1.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem