United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· NYISOSeward-Glory 115 kV
Seward-Glory 115 kV is a 100 MW solar request withdrawn in the NYISO interconnection queue, in Indiana County, Pennsylvania, connecting to PJM.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- A01-102
- Grid region
- NYISO (New York)
- Utility / transmission owner
- PJM
- Developer
- Clark Run Solar LLC
- Connection point (POI)
- Seward-Glory 115 kV
- Location
- Indiana County, Pennsylvania
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 26 September 2025
Location
Marker shows the centre of Indiana County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Indiana County
- Hoodlebug Solar Energy CenterSolar Β· 110 MW Β· agreement signed
- Gas project AH1-734, Indiana CountyGas Β· 270 MW Β· in study
- Solar project AH2-195, Indiana CountySolar Β· 65.0 MW Β· in study
- Solar project AG2-561, Indiana CountySolar Β· 20.0 MW Β· in study
- Gas project B05, Indiana CountyGas Β· 265 MW Β· built
- Keystone Generating StationCoal Β· 20.0 MW Β· built
- Keystone Generating StationCoal Β· 20.0 MW Β· built
- Conemaugh Generating StationCoal Β· 20.0 MW Β· built
- Conemaugh Generating StationCoal Β· 20.0 MW Β· built
- Gas project AB1-003, Indiana CountyGas Β· 1,474 MW Β· withdrawn
- Gas project G31, Indiana CountyGas Β· 610 MW Β· withdrawn
- Gas project G42, Indiana CountyGas Β· 600 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem