United States › Grid › Interconnection queues › Pennsylvania

COAL · PJM

Keystone Generating Station

Keystone Generating Station is a 20.0 MW coal request built and operating in the PJM interconnection queue, in Indiana County, Pennsylvania, connecting to PENELEC.

Queue statusOperating
  1. PlanningQueued Dec 2007 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingAug 2010 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
T110
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Keystone 500kV
Location
Indiana County, Pennsylvania
Technology
Coal: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
3 December 2007
Proposed online date
August 2010
Came online
August 2010

Location

Marker shows the centre of Indiana County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Indiana County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem