United States › Grid › Interconnection queues › Pennsylvania

ONSHORE WIND · NYISO

Black Cherry Wind 1

Black Cherry Wind 1 is a 350 MW onshore wind request withdrawn in the NYISO interconnection queue, in Cameron County, Pennsylvania, connecting to NYSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C24-298
Grid region
NYISO (New York)
Utility / transmission owner
NYSEG
Developer
Black Cherry Wind Power, LLC
Connection point (POI)
Homer City - Piercebrook 345kV
Location
Cameron County, Pennsylvania
Technology
Wind: 350 MW
Total requested
350 MW
Queue status
Withdrawn
Entered queue
29 September 2024

Location

Marker shows the centre of Cameron County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Cameron County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem